13. CLIMATE ACTION

Azerbaijan Power Plant Receives First Carbon Credits from Energy Efficiency Improvements | News | SDG Knowledge Hub | IISD

Azerbaijan Power Plant Receives First Carbon Credits from Energy Efficiency Improvements | News | SDG Knowledge Hub | IISD
Written by ZJbTFBGJ2T

Azerbaijan Power Plant Receives First Carbon Credits from Energy Efficiency Improvements | News | SDG Knowledge …  IISD’s SDG Knowledge Hub

Azerbaijan Power Plant Receives First Carbon Credits from Energy Efficiency Improvements | News | SDG Knowledge Hub | IISD

Azerbaijan’s Thermal Power Plant Modernization Project Earns Carbon Credits

5 December 2012:

A thermal power plant modernization project in Azerbaijan, financed by the European Bank for Reconstruction and Development (EBRD), has become the first project to earn carbon credits through energy efficiency measures. The project, known as AzDRES, has been registered with the Clean Development Mechanism (CDM) Board and is expected to generate over 10 million carbon credits over a period of 10 years. These credits can be sold on carbon markets, including the European Union’s (EU) Emissions Trading Scheme (ETS). The acceptance of AzDRES by the CDM Executive Board marks it as the first power plant energy efficiency modernization project registered under the CDM and only the second CDM project in Azerbaijan.

Sustainable Development Goals (SDGs)

  1. Goal 7: Affordable and Clean Energy
  2. Goal 9: Industry, Innovation, and Infrastructure
  3. Goal 13: Climate Action

The EBRD provided a loan of US$207 million in 2006 under its Sustainable Energy Initiative for the modernization and improvement of energy efficiency at Azerbaijan’s largest power plant, AzDRES ThPP. This power plant is responsible for supplying half of the country’s electric power. The project involved updating the command and control systems of the plant’s seven dual fuel units, as well as rehabilitating old and inefficient boilers and turbines. Additionally, the project included repairs to water cooling systems and chimneys. Along with the loan, the EBRD also provided technical assistance through its fund for early transition countries.

For more information, please visit the EBRD Press Release.

SDGs, Targets, and Indicators

SDGs Targets Indicators
SDG 7: Affordable and Clean Energy 7.3: Double the global rate of improvement in energy efficiency The thermal power plant modernization project in Azerbaijan aims to improve energy efficiency, which aligns with the target of doubling the global rate of improvement in energy efficiency.
SDG 13: Climate Action 13.2: Integrate climate change measures into national policies, strategies, and planning The project’s focus on energy efficiency and carbon credits demonstrates the integration of climate change measures into national policies and strategies.
SDG 17: Partnerships for the Goals 17.16: Enhance the global partnership for sustainable development The project’s financing by the European Bank for Reconstruction and Development (EBRD) and its registration with the Clean Development Mechanism (CDM) Board exemplify partnerships for sustainable development.

The article addresses or connects to the following SDGs:

  1. SDG 7: Affordable and Clean Energy
  2. SDG 13: Climate Action
  3. SDG 17: Partnerships for the Goals

Based on the article’s content, the specific targets that can be identified are:

  • Target 7.3: Double the global rate of improvement in energy efficiency
  • Target 13.2: Integrate climate change measures into national policies, strategies, and planning
  • Target 17.16: Enhance the global partnership for sustainable development

The article mentions the following indicators that can be used to measure progress towards the identified targets:

  • The thermal power plant modernization project in Azerbaijan aims to improve energy efficiency, which aligns with the target of doubling the global rate of improvement in energy efficiency (Target 7.3).
  • The project’s focus on energy efficiency and carbon credits demonstrates the integration of climate change measures into national policies and strategies (Target 13.2).
  • The project’s financing by the European Bank for Reconstruction and Development (EBRD) and its registration with the Clean Development Mechanism (CDM) Board exemplify partnerships for sustainable development (Target 17.16).

Behold! This splendid article springs forth from the wellspring of knowledge, shaped by a wondrous proprietary AI technology that delved into a vast ocean of data, illuminating the path towards the Sustainable Development Goals. Remember that all rights are reserved by SDG Investors LLC, empowering us to champion progress together.

Source: sdg.iisd.org

 

Join us, as fellow seekers of change, on a transformative journey at https://sdgtalks.ai/welcome, where you can become a member and actively contribute to shaping a brighter future.

 

About the author

ZJbTFBGJ2T